Course curriculum

    1. Introduction

    2. Place holder for Advantages 11-23

    3. Place holder for Fiber geometry 11-23

    4. Moisture/Water-blocking 11-23

    5. Micro Technology 11-23

    6. Color Coding 11-23

    1. Environmental Considerations 11-23

    2. Environmental Control Officer (ECO) 11-23

    3. Contractor’s Environmental Management Plan 11-23

    4. Contractor Responsibilities 11-23

    5. A few Activity-specific Guideline Examples 11-23

    6. Water 11-23

    7. Dust / Air Pollution 11-23

    8. Noise Pollution 11-23

    9. Trees 11-23

    10. Archaeology and Cultural Heritage 11-23

    11. Environmentally Sensitive Areas 11-23

    12. Concrete / Cement 11-23

    1. General Health and Safety 11-23

    2. Responsibility of Management 11-23

    3. Responsibility of Supervisors 11-23

    4. Compliance 11-23

    5. Important work Practices 11-23

    6. Work Practices Cont. 11-23

    7. Typical Table of Contents for a Site Safety File 11-23

    8. Flagging PPE and Communication 11-23

    1. Pre-Build Procedures 11-23

    2. Pre-Build Survey Equipment and Tools 11-23

    3. Pre-Build Survey Chart 11-23

    4. Wayleave’s (A right of way granted by a landowner) 11-23

    5. Contractor’s Camp Establishment / Holding Area 11-23

    1. OTDR and Pre installation Cable Inspection 11-23

    2. Example of a Fiber Optic Acceptance Test from the NRAO very detailed

    1. Lesson 1: Installation Techniques and Materials: Concrete encasing 11-23

    2. Trenching 11-23

    3. Trench Width 11-23

    4. Pilot Holes 11-23

    5. Location of Services 11-23

    6. Trenches Deeper than 5 feet 11-23

    7. Notifications 11-23

    8. Private Property 11-23

    9. Suggested Trenching Practices 11-23

    10. Barricading 11-23

    11. Trenching Near Curbs, Guttering, Paving and Driveway Crossings 11-23

    12. Trenching Near Power Cables 11-23

    13. Road Crossings 11-23

    14. Bridge Crossings 11-23

    15. Stream and River Crossings 11-23

    16. Rock Blasting and duct deviation 11-23

    17. Steep Gradient Trenching, Tree Roots and Surface Material 11-23

    18. Duct Un-Coiling and Installation Process 11-23

    19. Bedding and Padding 11-23

    20. Backfill and warning tape, Trench compacting and Optimum moisture content 11-23

    21. Direct-Buried Installations 11-23

    22. Dynamic Cone Penetrometer (DCP) Testing 11-23

    23. Earthing, Bonding, and Surge Protection 11-23

    24. Man and Hand Holes 11-23

    25. Man and Hand Holes Cont. 11-23

    26. Reinstatements 11-23

    27. Road Reinstatements 11-23

About this course

  • Free
  • 137 lessons
  • 0 hours of video content

Discover your potential, starting today